
Installation Solutions
Have a
tough installation? Wood Stone has a solution.
Below are some
commonly asked questions in regards to installation. If you can't
find what you are looking for, check our
commercial recommendations or call us at (800) 578-6836.
Bistro Home
Ovens
The compact
Bistro
Home 4343 can be
removed from its stand and turned on its side to fit through a 30"
doorway.
Oven Clearances - Bistro Home Ovens
printer friendly version

The Bistro oven should have a
minimum 1" (25mm) clearance to combustibles from all sides, and 6"
(152mm) clearance to combustibles from the top, and a 6" (152mm) clearance from
the draft diverter.
If building materials will
contact the oven, they must be completely noncombustible. Please
note that standard drywall (or sheet rock) is considered a
combustible.
If the area directly above the doorway and
6" (152mm) to each side of the
doorway is to be covered with a facade, it must be of a non-combustible material.
This oven should only be
installed on a non-combustible floor that extends 36" (914mm) to the front and
30" (762mm) to the sides.
All ovens equipped for stucco
application must have a clearance of 36" (914mm) to combustibles from all
sides and the top.
To get more ideas about how to facade your oven, look at our
Bistro Facade Information
and Photo Gallery.
Oven Clearances - Mountain Home Series Ovens
printer friendly version

The Mt. Series oven should have
a minimum 1" (25mm) clearance to combustibles from all sides, and 14"
(356mm)
clearance to combustibles from the top.
If building materials will
contact the oven, they must be completely noncombustible. Please
note that standard drywall (or sheet rock) is considered a
combustible.
If the area directly above the doorway and
6" (152mm) to each side of the
doorway is to be covered with a facade, it must be of a non-combustible material.
1" (25mm) minimum side
clearance to combustibles. Non-combustible construction may
contact the oven and must then maintain 1" (25mm) clearance to combustibles.
Install this oven only on a
non-combustible floor which extends at least 36" (914mm) in front of
and 30" (762mm) to either side of the door.
All ovens equipped for stucco
application must have a clearance of 36" (914mm) to combustibles from all
sides and the top.
To get more ideas about how to facade your oven, look at our
Mountain Home Series Facade
Tutorial and Photo Gallery.
Rigger Solutions - Roll Over Cages for
Mountain Series Ovens
 |

|
|
Oven |
W |
X |
Y |
Z |
|
Mt. Chuckanut
(4') |
50" |
45" |
42" |
65" |
|
Mt. Adams
(5') |
64" |
47" |
48" |
75" |
|
Note: X and Z are the critical dimensions.
X represents the width of the opening you will need,
Z the height. W equals the width of the
oven. |
|
Another Note! The ‘Z’
dimensions, the dimension which determines what height door the
oven in the rollover cage can fit through, includes enough
height to accommodate a façade extension. If it’s a tight fit
and the ‘Z’ dimension noted here is too tall, we can provide a custom rollover
cage. Please contact the factory for more information if you
think you might need a shorter version.
|
|