Kitchen          Photos         Products        Company Info         Installation          Order          Contact Us
Bottom Header
contact-top-spacer
contact-left-spacer

Ventilation

Moving

Site Prep

Installation Solutions

Facade Tutorial
     •Bistro
     •Mt. Chuckanut

Manuals

Start Up

Daily Operations

Utility Requirements


Installation
Installation Solutions

Have a tough installation? Wood Stone has a solution.

Below are some commonly asked questions in regards to installation. If you can't find what you are looking for, check our commercial recommendations or call us at (800) 578-6836.


Bistro Home Ovens

The compact Bistro Home 4343 can be removed from its stand and turned on its side to fit through a 30" doorway.


Oven Clearances - Bistro Home Ovens

printer friendly version

Bistro Oven Clearance Information

  • The Bistro oven should have a minimum 1" (25mm) clearance to combustibles from all sides, and 6" (152mm) clearance to combustibles from the top, and a 6" (152mm) clearance from the draft diverter.

  • If building materials will contact the oven, they must be completely noncombustible.  Please note that standard drywall (or sheet rock) is considered a combustible.

  • If the area directly above the doorway and 6" (152mm) to each side of the doorway is to be covered with a facade, it must be of a non-combustible material.

  • This oven should only be installed on a non-combustible floor that extends 36" (914mm) to the front and 30" (762mm) to the sides.

  • All ovens equipped for stucco application must have a clearance of 36" (914mm) to combustibles from all sides and the top.

To get more ideas about how to facade your oven, look at our Bistro Facade Information and Photo Gallery.


Oven Clearances - Mountain Home Series Ovens

printer friendly version

Mountain Series Stone Hearth Oven Clearance Info

  • The Mt. Series oven should have a minimum 1" (25mm) clearance to combustibles from all sides, and 14" (356mm) clearance to combustibles from the top.

  • If building materials will contact the oven, they must be completely noncombustible.  Please note that standard drywall (or sheet rock) is considered a combustible.

  • If the area directly above the doorway and 6" (152mm) to each side of the doorway is to be covered with a facade, it must be of a non-combustible material.

  • 1" (25mm) minimum side clearance to combustibles.  Non-combustible construction may contact the oven and must then maintain 1" (25mm) clearance to combustibles.

  • Install this oven only on a non-combustible floor which extends at least 36" (914mm) in front of and 30" (762mm) to either side of the door.

  • All ovens equipped for stucco application must have a clearance of 36" (914mm) to combustibles from all sides and the top.

To get more ideas about how to facade your oven, look at our Mountain Home Series Facade Tutorial and Photo Gallery.


Rigger Solutions - Roll Over Cages for Mountain Series Ovens


 
Oven W X Y Z
Mt. Chuckanut (4') 50" 45" 42" 65"
Mt. Adams (5') 64" 47" 48" 75"
Note: X and Z are the critical dimensions.  X represents the width of the opening you will need, Z the height.  W equals the width of the oven.

 

Another Note!  The ‘Z’ dimensions, the dimension which determines what height door the oven in the rollover cage can fit through, includes enough height to accommodate a façade extension. If it’s a tight fit and the ‘Z’ dimension noted here is too tall, we can provide a custom rollover cage.  Please contact the factory for more information if you think you might need a shorter version.
 
contact-right-spacer